|
Kid Kulafu
|
 |
« on: March 21, 2009, 11:53:46 AM » |
|
Anyone has an AutoCad file or pdf of an Electronics Plan?
Ano ba yung mga nakalagay sa Electronics Plan? I'm referring to the Electronics Plan na i-submit sa building official/ city engr....
|
|
|
|
|
Logged
|
|
|
|
|
The Philippine Electronics and Technology Forum
|
 |
« on: March 21, 2009, 11:53:46 AM » |
|
|
|
|
|
|
Logged
|
|
|
|
akhen
Diesel Generator
Pogi/Ganda Points: 41
Offline
Gender: 
Posts: 1080
"Learning is good but application is 100x better!"
|
 |
« Reply #1 on: March 21, 2009, 12:21:09 PM » |
|
During college days we made a telephone line plan of a 3 story building. Madugo sa details as in pati cabinet dapat kasama. Kaya lang naerase na yung autocadd file nung nagreformat ako ng PC.
|
|
|
|
|
Logged
|
|
|
|
|
Kid Kulafu
|
 |
« Reply #2 on: March 26, 2009, 03:13:08 PM » |
|
Sino kaya yung taga telecoms dito....
|
|
|
|
|
Logged
|
|
|
|
zer0w1ng
Technical People
Gas Turbine
   
Pogi/Ganda Points: 295
Offline
Gender: 
Posts: 2151
Enter any 11-digit prime number to continue...
|
 |
« Reply #3 on: March 26, 2009, 03:35:20 PM » |
|
Is the Electronics Plan signed by a PECE requirement enforced already with the Office of the building officials? It should be, to really recognize professional electronics engineers and equal footings as PEE, PME, PCE or archietects.
|
|
|
|
|
Logged
|
|
|
|
|
Kid Kulafu
|
 |
« Reply #4 on: March 27, 2009, 12:55:29 PM » |
|
Is the Electronics Plan signed by a PECE requirement enforced already with the Office of the building officials? It should be, to really recognize professional electronics engineers and equal footings as PEE, PME, PCE or archietects.
IECEP local chapters should pressure the LGUs to implement the provisions for ELectronics Permit as stated in the revised IRR of the National Building Code. In some Cities and Municipalities it is already implemented.
|
|
|
|
|
Logged
|
|
|
|
markabao2009
LR44 Battery
Pogi/Ganda Points: 2
Offline
Posts: 2
|
 |
« Reply #5 on: April 12, 2009, 12:19:26 PM » |
|
Mga contractor meron yun plan ng LAN, CCTV, Fire alarm system...
|
|
|
|
|
Logged
|
|
|
|
markabao2009
LR44 Battery
Pogi/Ganda Points: 2
Offline
Posts: 2
|
 |
« Reply #6 on: June 14, 2009, 05:33:17 PM » |
|
Is the Electronics Plan signed by a PECE requirement enforced already with the Office of the building officials? It should be, to really recognize professional electronics engineers and equal footings as PEE, PME, PCE or archietects.
Meron akong nakita sa website ng isang chapter ng iecep sa mindanao meron silang seminar about Electronics Plan preparation. Parang on its way towards standardization pa lang yata ang ELectronics Plan ngayon. Implemented sa yata sa Cagayan De Oro ang Electronics Permit. Minimum of P1,500.00 per sign and seal ng PECE ang charge if less than 5 documents. Then P300.00 per page if more than 5 pages. Cellsite is P3,000.00 per sign ang charge daw. Kung ikaw ang gagawa ng plan pwede mong singilin a certain percentage from the total cost of equipment.
|
|
|
|
|
Logged
|
|
|
|
rdpzycho
Technical People
Solar Power Satellite
   
Pogi/Ganda Points: 467
Offline
Gender: 
Posts: 9160
Perfection is an Illusion
|
 |
« Reply #7 on: June 14, 2009, 07:57:43 PM » |
|
parang sa electrical din. kung saan dadaan ang wires at mga symbols representing the equipment. kung wireless repeater 'yung layout, nakasulat din kung ilang dBm output doon sa dulo na antenna.
|
|
|
|
|
Logged
|
"Keep on starting, and finishing will take care of itself."
- Neil Fiore
|
|
|
hanchi
LR44 Battery
Pogi/Ganda Points: 0
Offline
Posts: 0
|
 |
« Reply #8 on: December 09, 2009, 11:09:04 AM » |
|
Sana magpaseminar ang IECEP sa guidelines ng paggawa ng Electronics Plan. Para naman maayos at pare pareho ang requirements, hindi ung puro hula hula lang.
|
|
|
|
|
Logged
|
|
|
|
|
Kid Kulafu
|
 |
« Reply #9 on: January 10, 2010, 03:39:22 PM » |
|
Baka 2010 or 2011 lalabas ang bagong Philippine Electronics Code dahil narinig ko na meron nang committee na mag-asikaso at mag formulate ng bagong Code. Baka nandoon na ang guidelines. Pero need pa natin maghintay. 
|
|
|
|
|
Logged
|
|
|
|
tubemaster
CR2032 Battery

Pogi/Ganda Points: 0
Offline
Gender: 
Posts: 37
Pag gusto my paraan; pag ayaw maraming dahilan...
|
 |
« Reply #10 on: March 07, 2010, 12:13:53 AM » |
|
last jan 24, 2010, nagconduct po ng Telecoms Engg design seminar ang IECEP calabarzon. it was held in colegio de san juan de letran-calamba, 8-5pm at galing middle east ang speaker pero filipino ece engr din. sayang mga kapatid. ang galing ng speaker lalo sa mga auto cad designs nia kc nagpakita sya ng sample designs nia sa company nila. this coming march 27 (tentative date p lng po), we will again conduct a seminar at La Salle dasma. its about electronics permit (the topic is still not final), para po ito s mga professionals (PECE and ECE), im not sure if pwede sa students. P1k po regs fee.
anyways, sa calamba city po ay fully implemented na ang electronics permit at pti sa batangas area most especially sa mga PEZA...
|
|
|
|
|
Logged
|
"if it's easy, it's not ECE"
|
|
|
|
Kid Kulafu
|
 |
« Reply #11 on: March 09, 2010, 02:30:37 PM » |
|
last jan 24, 2010, nagconduct po ng Telecoms Engg design seminar ang IECEP calabarzon. it was held in colegio de san juan de letran-calamba, 8-5pm at galing middle east ang speaker pero filipino ece engr din. sayang mga kapatid. ang galing ng speaker lalo sa mga auto cad designs nia kc nagpakita sya ng sample designs nia sa company nila. this coming march 27 (tentative date p lng po), we will again conduct a seminar at La Salle dasma. its about electronics permit (the topic is still not final), para po ito s mga professionals (PECE and ECE), im not sure if pwede sa students. P1k po regs fee.
anyways, sa calamba city po ay fully implemented na ang electronics permit at pti sa batangas area most especially sa mga PEZA...
Congrats! Thats good. Dahil fully implemented na sa lugar nyo. Sa ibang probinsya hindi pa masyado pero on their way to implementation na rin ciguro.
|
|
|
|
|
Logged
|
|
|
|
|
The Philippine Electronics and Technology Forum
|
|
|
|
|
|
Logged
|
|
|
|
|