The Philippine Electronics and Technology Forum
February 10, 2012, 01:31:09 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
 
   Home   Help Search Login Register  

Pages: [1]   Go Down
  Print  
Author Topic: Electronics Plan - Sample CAD file  (Read 2186 times)
Kid Kulafu
Size AA Battery
****

Pogi/Ganda Points: 1
Offline Offline

Posts: 133


« on: March 21, 2009, 11:53:46 AM »

Anyone has an AutoCad file or pdf of an Electronics Plan?

Ano ba yung mga nakalagay sa Electronics Plan? I'm referring to the Electronics Plan na i-submit sa building official/ city engr....
Logged
The Philippine Electronics and Technology Forum
« on: March 21, 2009, 11:53:46 AM »

 Logged
akhen
Diesel Generator
*

Pogi/Ganda Points: 41
Offline Offline

Gender: Female
Posts: 1080


"Learning is good but application is 100x better!"


« Reply #1 on: March 21, 2009, 12:21:09 PM »

During college days we made a telephone line plan of a 3 story building. Madugo sa details as in pati cabinet dapat kasama. Kaya lang naerase na yung autocadd file nung nagreformat ako ng PC.
Logged

Kid Kulafu
Size AA Battery
****

Pogi/Ganda Points: 1
Offline Offline

Posts: 133


« Reply #2 on: March 26, 2009, 03:13:08 PM »

Sino kaya yung taga telecoms dito....
Logged
zer0w1ng
Technical People
Gas Turbine
*****

Pogi/Ganda Points: 295
Offline Offline

Gender: Male
Posts: 2151


Enter any 11-digit prime number to continue...


WWW
« Reply #3 on: March 26, 2009, 03:35:20 PM »

Is the Electronics Plan signed by a PECE requirement enforced already with the Office of the building officials?
It should be, to really recognize professional electronics engineers and equal footings as PEE, PME, PCE or archietects.
Logged

Kid Kulafu
Size AA Battery
****

Pogi/Ganda Points: 1
Offline Offline

Posts: 133


« Reply #4 on: March 27, 2009, 12:55:29 PM »

Is the Electronics Plan signed by a PECE requirement enforced already with the Office of the building officials?
It should be, to really recognize professional electronics engineers and equal footings as PEE, PME, PCE or archietects.
IECEP local chapters should pressure the LGUs to implement the provisions for ELectronics Permit as stated in the revised IRR of the National Building Code. In some Cities and Municipalities it is already implemented.

Logged
markabao2009
LR44 Battery
*

Pogi/Ganda Points: 2
Offline Offline

Posts: 2


« Reply #5 on: April 12, 2009, 12:19:26 PM »

Mga contractor meron yun plan ng LAN, CCTV, Fire alarm system...
Logged
markabao2009
LR44 Battery
*

Pogi/Ganda Points: 2
Offline Offline

Posts: 2


« Reply #6 on: June 14, 2009, 05:33:17 PM »

Is the Electronics Plan signed by a PECE requirement enforced already with the Office of the building officials?
It should be, to really recognize professional electronics engineers and equal footings as PEE, PME, PCE or archietects.
Meron akong nakita sa website ng isang chapter ng iecep sa mindanao meron silang seminar about Electronics Plan preparation. Parang on its way towards standardization pa lang yata ang ELectronics Plan ngayon.

Implemented sa yata sa Cagayan De Oro ang Electronics Permit.
Minimum of P1,500.00 per sign and seal ng PECE ang charge if less than 5 documents. Then P300.00 per page if more than 5 pages. Cellsite is P3,000.00 per sign ang charge daw. Kung ikaw ang gagawa ng plan pwede mong singilin a certain percentage from the total cost of equipment.
Logged
rdpzycho
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 467
Offline Offline

Gender: Male
Posts: 9160


Perfection is an Illusion


WWW
« Reply #7 on: June 14, 2009, 07:57:43 PM »

parang sa electrical din. kung saan dadaan ang wires at mga symbols representing the equipment. kung wireless repeater 'yung layout, nakasulat din kung ilang dBm output doon sa dulo na antenna.
Logged

‎"Keep on starting, and finishing will take care of itself."

- Neil Fiore
hanchi
LR44 Battery
*

Pogi/Ganda Points: 0
Offline Offline

Posts: 0


« Reply #8 on: December 09, 2009, 11:09:04 AM »

Sana magpaseminar ang IECEP sa guidelines ng paggawa ng Electronics Plan. Para naman maayos at pare pareho ang requirements, hindi ung puro hula hula lang.
Logged
Kid Kulafu
Size AA Battery
****

Pogi/Ganda Points: 1
Offline Offline

Posts: 133


« Reply #9 on: January 10, 2010, 03:39:22 PM »

Baka 2010 or 2011 lalabas ang bagong Philippine Electronics Code dahil narinig ko na meron nang committee na mag-asikaso at mag formulate ng bagong Code. Baka nandoon na ang guidelines. Pero need pa natin maghintay. Smiley
Logged
tubemaster
CR2032 Battery
**

Pogi/Ganda Points: 0
Offline Offline

Gender: Female
Posts: 37


Pag gusto my paraan; pag ayaw maraming dahilan...


« Reply #10 on: March 07, 2010, 12:13:53 AM »

last jan 24, 2010, nagconduct po ng Telecoms Engg design seminar ang IECEP calabarzon. it was held in colegio de san juan de letran-calamba, 8-5pm at galing middle east ang speaker pero filipino ece engr din. sayang mga kapatid. ang galing ng speaker lalo sa mga auto cad designs nia kc nagpakita sya ng sample designs nia sa company nila. this coming march 27 (tentative date p lng po), we will again conduct a seminar at La Salle dasma. its about electronics permit (the topic is still not final), para po ito s mga professionals (PECE and ECE), im not sure if pwede sa students. P1k po regs fee.

anyways, sa calamba city po ay fully implemented na ang electronics permit at pti sa batangas area most especially sa mga PEZA...
Logged

"if it's easy, it's not ECE"
Kid Kulafu
Size AA Battery
****

Pogi/Ganda Points: 1
Offline Offline

Posts: 133


« Reply #11 on: March 09, 2010, 02:30:37 PM »

last jan 24, 2010, nagconduct po ng Telecoms Engg design seminar ang IECEP calabarzon. it was held in colegio de san juan de letran-calamba, 8-5pm at galing middle east ang speaker pero filipino ece engr din. sayang mga kapatid. ang galing ng speaker lalo sa mga auto cad designs nia kc nagpakita sya ng sample designs nia sa company nila. this coming march 27 (tentative date p lng po), we will again conduct a seminar at La Salle dasma. its about electronics permit (the topic is still not final), para po ito s mga professionals (PECE and ECE), im not sure if pwede sa students. P1k po regs fee.

anyways, sa calamba city po ay fully implemented na ang electronics permit at pti sa batangas area most especially sa mga PEZA...
Congrats! Thats good. Dahil fully implemented na sa lugar nyo. Sa ibang probinsya hindi pa masyado pero on their way to implementation na rin ciguro.
Logged
The Philippine Electronics and Technology Forum
   

 Logged
Pages: [1]   Go Up
  Print  
 
Jump to:  


Related Topics
Subject Started by Replies Views Last post
Share your plan this summer? « 1 2 »
Culture and Lifestyle
express 34 2892 Last post March 08, 2008, 12:38:55 PM
by 7_SeVeN_7
Industrial plan
EE Students
edwardcaezar 3 949 Last post September 02, 2010, 10:29:48 PM
by iyo karpo
Industrial plan
GEAS
edwardcaezar 0 684 Last post July 20, 2009, 11:12:36 PM
by edwardcaezar
The Swine Flu Conspiracy: A Plan to Commit Mass Murder
Health and Medicine
Co0LėT♥ 4 607 Last post December 14, 2009, 02:03:52 PM
by jeje-BUSTER
here is the plan
Thesis and Project Proposal
laking_tao 8 192 Last post July 22, 2011, 05:52:17 PM
by Anak ng
Powered by MySQL Powered by PHP Powered by SMF 1.1.15 | SMF © 2011, Simple Machines Valid XHTML 1.0! Valid CSS!