The Philippine Electronics and Technology Forum
February 08, 2012, 02:07:18 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
 
   Home   Help Search Login Register  

Pages: [1] 2 3 ... 7   Go Down
  Print  
Author Topic: ECE to PECE  (Read 10679 times)
krayziebone
Size C Battery
*****

Pogi/Ganda Points: 9
Offline Offline

Gender: Male
Posts: 183



« on: February 19, 2008, 09:55:03 PM »

PROCEDURE FOR UPGRADING
Electronics Engineer (ECE) to Professional Electronics Engineer (PECE)

1.0. Preparation of necessary document:
1.1 Application form;
a) Attached is the copy of Application form without Examination (Form
No. 01 and 03) to be filled up for upgrading.
1.2 Attachments;
a) Valid PRC ID as Electronics Engineer or Certificate as Electronics
Engineer
b) Valid IECEP ID or Certificate of Membership in good standing from
IECEP.
c) Certified experience record of active self-practice and/or employment
either in government service or in private sector, in the format to be
prescribed by the Board, indicating the inclusive dates, companies
worked for, description of specific responsibilities, relevant
accomplishments and name, position of immediate supervisor for a
period of at least seven (7) years (inclusive and/or aggregate), at least
two (2) years of which are in responsible charge of significant
engineering work, from the date applicant took his/her oath as an
Electronics and Communications Engineer or Electronics Engineer.
d) Three (3) certification signed by three (3) PECE attesting that the
experience record submitted by the applicant is factual (not needed
for those who have been registered and licensed as ECE under R.A.
5734, for at least seven (7) years.
e) NBI clearance and for those in government service, Ombudsman
clearance.
1.3 Fees to be paid;
a) Php 900.00 - for processing
b) Php 600.00 - for registration
c) Php 450.00 - ID (3 years)
1.4 2 pcs passport size ID picture
(colored picture with complete name tag in plain white background)

2.0 Filing of Application Letter:
2.1 Completed application form shall be filed with PRC offices (Main or
Regional) or with IECEP offices (National or Chapters) who shall assist
with the filing of the application with PRC.
2.2 PRC upon receipt shall process the documents and shall forward papers to
the Board of Electronics Engineering for evaluation, after payment of
required fees.

3.0 Action of the Board:
3.1 Upon receipt, the board shall evaluate the documents.
3.2 The Board may require submission of additional documents or schedule
interview.
3.3 Applicant shall be informed of the Board?s evaluation.
3.4 If approved, successful applicant shall be notified accordingly.
3.5 The Board, in coordination with IECEP and upon approval by the
Commission, shall schedule a formal Oath-taking ceremony where the
New Certificate as PECE shall be given.
The Professional Seal shall also be given at nominal fees which shall be handled
by the IECEP in coordination with the Board for control and database upkeep
purposes.
Logged
The Philippine Electronics and Technology Forum
« on: February 19, 2008, 09:55:03 PM »

 Logged
shark
LR44 Battery
*

Pogi/Ganda Points: 0
Offline Offline

Posts: 0


« Reply #1 on: February 22, 2008, 06:40:37 PM »

Huh?  What's the difference sa Electronics and Communication Engr?
Logged
krayziebone
Size C Battery
*****

Pogi/Ganda Points: 9
Offline Offline

Gender: Male
Posts: 183



« Reply #2 on: February 23, 2008, 04:58:15 AM »

ahmm sir, sa akin lang po, kung PECE kumbaga mas astig ka.. mas well-versed ka sa field.. mas experienced.. parang elite..  Grin
Logged
toasted siopao
She loves me, she loves me not, she loves me...
Global Moderator
Diesel Generator
*****

Pogi/Ganda Points: 80
Offline Offline

Gender: Female
Posts: 1710



« Reply #3 on: February 23, 2008, 07:39:05 AM »

Ano naman ang magiging benefit sa atin ng pagiging PECE? Di naman ito recognised sa labas, wala naman tayo pinipirmahan kagaya ng EE, kaya halos wala ring kwenta, masyado marami pang gray areas ang building code natin, dapat ipolish na, ang problema, napopolitika.
Logged

Enjoying the Australian outback.
7_SeVeN_7
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 380
Offline Offline

Posts: 5954


There is no delight in owning anything unshared.


« Reply #4 on: February 23, 2008, 08:01:54 AM »

Di naman ito recognised sa labas,

 Cry Cry Cry Cry
Logged

E-Gizmo Mechatronix Central: www.e-gizmo.com

Tel #: (63)(2) 536-3378
Globe +63915-973-7691
Smart +63921-779-0748

Location Map

YM: julie.egizmo  aka Born2BeWired  Grin
beginner wan
Diesel Generator
*

Pogi/Ganda Points: 46
Offline Offline

Gender: Male
Posts: 1454


Think Positive! Matutupad yang dream mo!


WWW
« Reply #5 on: February 23, 2008, 11:40:13 PM »

Ano naman ang magiging benefit sa atin ng pagiging PECE? Di naman ito recognised sa labas, wala naman tayo pinipirmahan kagaya ng EE, kaya halos wala ring kwenta, masyado marami pang gray areas ang building code natin, dapat ipolish na, ang problema, napopolitika.

sa pagkaka-alam ko po, kakasabi lang ng prof ko sa EcE laws.. may bagong building code na kung saan ay kailangan ng pumirma ng isang PECE bago magkaroon ng permit at magkapagtayo ng gusali...   Grin
Logged

i;0.?QrEpM?4DEZZ]bkH{w@F<38.Jq@92Ds3KPQj60?EA7U\3M<A84J|AI.H
R@>&?Ej,@;5H)o::7KE/:?QcXf?gX'39=,Z_Q[eYXc
krayziebone
Size C Battery
*****

Pogi/Ganda Points: 9
Offline Offline

Gender: Male
Posts: 183



« Reply #6 on: February 24, 2008, 02:19:40 AM »

sa pagkaka-alam ko po, kakasabi lang ng prof ko sa EcE laws.. may bagong building code na kung saan ay kailangan ng pumirma ng isang PECE bago magkaroon ng permit at magkapagtayo ng gusali...   Grin

matagal na po tong plano.. ang hindi lang alam kung kelan mapapatupad..
Logged
beginner wan
Diesel Generator
*

Pogi/Ganda Points: 46
Offline Offline

Gender: Male
Posts: 1454


Think Positive! Matutupad yang dream mo!


WWW
« Reply #7 on: February 24, 2008, 08:16:00 AM »

matagal na po tong plano.. ang hindi lang alam kung kelan mapapatupad..

ang alam ko po ay ipinapatupad na ito sabay ng pagpapatupad ng RA 9292...
Logged

i;0.?QrEpM?4DEZZ]bkH{w@F<38.Jq@92Ds3KPQj60?EA7U\3M<A84J|AI.H
R@>&?Ej,@;5H)o::7KE/:?QcXf?gX'39=,Z_Q[eYXc
express
Size D Battery
******

Pogi/Ganda Points: 8
Offline Offline

Posts: 305


« Reply #8 on: February 25, 2008, 11:44:22 PM »

Sana ang implement nila ung recognized sa labas.
Logged
7_SeVeN_7
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 380
Offline Offline

Posts: 5954


There is no delight in owning anything unshared.


« Reply #9 on: February 26, 2008, 11:56:47 AM »

^^ Sana nga... kung hinde, dagdag kita na naman sa kanila yan  Cry
Logged

E-Gizmo Mechatronix Central: www.e-gizmo.com

Tel #: (63)(2) 536-3378
Globe +63915-973-7691
Smart +63921-779-0748

Location Map

YM: julie.egizmo  aka Born2BeWired  Grin
pepsiman
LR44 Battery
*

Pogi/Ganda Points: 0
Offline Offline

Gender: Male
Posts: 1


Yosh!!


« Reply #10 on: March 13, 2008, 09:21:09 PM »

hay naku dagdag kita nga lang yan... saka hindi tayu lang naman may ECE eh... Shocked Shocked Shocked Shocked
Logged

... =) ...
penny
Size C Battery
*****

Pogi/Ganda Points: 22
Offline Offline

Posts: 236


« Reply #11 on: March 13, 2008, 09:32:45 PM »

IMHO- I think kaya nacreate ung PECE is to address the many issues confronting the ECE profession, it's just a gauge on an engineers professional skills, kumbaga ibang level ka na na engineer, kasi meron ibang mga licensed engineers na alang work after like 7-10 years na but never theless engineers parin ang title nila, siguro para lang to be fair to those who are committed to their role as an ENGINEER. ...I dunnoow, opinion lang po!!!
Logged
Syfertex
CR2032 Battery
**

Pogi/Ganda Points: 0
Offline Offline

Gender: Male
Posts: 16


ECE Batch 2005


« Reply #12 on: March 26, 2008, 10:06:52 AM »

Meron bang form sa PRC or san kaya tayo magsisimula?   Huh
Logged

Kaharap ko computer ko. ehh... kayo??? Smiley Smiley Smiley
rdpzycho
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 462
Offline Offline

Gender: Male
Posts: 9140


Perfection is an Illusion


WWW
« Reply #13 on: March 26, 2008, 10:59:48 AM »

yung PME iniimplement na ata...

sabi ng tatay ko nung dati daw medyo kailangan daw ng pirma...EE kasi siya and siya rin nagdradrawing ng layout ng phone lines at data lines (normally for banks)...

kailangan ECE daw pumirma nung sa phone lines at data lines diagram...pero ngayon hindi na hinahanap...

para sa akin mali ata ung term na Professional...kasi ang alam kong definition niyan, someone who uses his skills on that area as a Profession or a means of making money...like Professional Basketball players...may bano may magaling pero yun ang way nila para kumita ng pera kaya Professional...basically, lahat ng graduate ngayon Professional na... Grin
Logged

‎"Keep on starting, and finishing will take care of itself."

- Neil Fiore
rdpzycho
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 462
Offline Offline

Gender: Male
Posts: 9140


Perfection is an Illusion


WWW
« Reply #14 on: March 26, 2008, 11:01:53 AM »

ahmm sir, sa akin lang po, kung PECE kumbaga mas astig ka.. mas well-versed ka sa field.. mas experienced.. parang elite..  Grin

ganun din sa akin (kahit maraming mas magaling na hindi PECE or walang license)...kumbaga sa military, napromote ka ng rank... Grin
Logged

‎"Keep on starting, and finishing will take care of itself."

- Neil Fiore
Google
Diesel Generator
*

Pogi/Ganda Points: 20
Offline Offline

Posts: 1378



« Reply #15 on: March 26, 2008, 08:37:00 PM »

Yung organization ng EE, matatag na hindi tulad ng sa IECEP hindi pa yata eh ultimo official website under construction pa rin hanggang ngayon  Cry
Logged

“If you limit your choices only to what seems possible or reasonable, you disconnect yourself from what you truly want, and all that is left is compromise.”
rdpzycho
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 462
Offline Offline

Gender: Male
Posts: 9140


Perfection is an Illusion


WWW
« Reply #16 on: March 26, 2008, 08:55:00 PM »

yung IIEE may lifetime membership at free subscription sa Electrical Engineer magazine...
Logged

‎"Keep on starting, and finishing will take care of itself."

- Neil Fiore
Google
Diesel Generator
*

Pogi/Ganda Points: 20
Offline Offline

Posts: 1378



« Reply #17 on: March 26, 2008, 10:56:34 PM »

buti pa yung organization ng mga CE ginagawang FELLOW yung mga members nila n matagal ng nagpapractice hindi tulad sa IECEP
Logged

“If you limit your choices only to what seems possible or reasonable, you disconnect yourself from what you truly want, and all that is left is compromise.”
rdpzycho
Technical People
Solar Power Satellite
*****

Pogi/Ganda Points: 462
Offline Offline

Gender: Male
Posts: 9140


Perfection is an Illusion


WWW
« Reply #18 on: March 26, 2008, 11:01:24 PM »

kaya IEEE ang maintained membership ko... Grin

marami rin akong napupulot from their Digital Libraries...and some Magazines that they ship here...
Logged

‎"Keep on starting, and finishing will take care of itself."

- Neil Fiore
penny
Size C Battery
*****

Pogi/Ganda Points: 22
Offline Offline

Posts: 236


« Reply #19 on: March 26, 2008, 11:06:29 PM »

why not raise these concerns to IECEP mismo? baka thay can do something about it!
Logged
The Philippine Electronics and Technology Forum
   

 Logged
Pages: [1] 2 3 ... 7   Go Up
  Print  
 
Jump to:  


Related Topics
Subject Started by Replies Views Last post
CONVERSION of ECE LICENSE to PECE and TECHNICIAN « 1 2 3 4 5 »
Professional People
Wilfredo 97 8602 Last post November 04, 2010, 01:22:17 PM
by Kid Kulafu
PECE application and interview « 1 2 ... 9 10 »
Professional People
markabao2009 196 15426 Last post October 08, 2011, 09:50:47 PM
by shockingshockley
Sa mga PECE na po jan....
Professional People
cmendoza517 1 904 Last post October 26, 2009, 10:43:57 AM
by Kid Kulafu
PECE Consultant
Professional People
powerfulreviewcenter 1 753 Last post March 09, 2010, 02:25:05 PM
by Kid Kulafu
sa mga PECE na po jan na may experience na mag sign at seal....
Professional People
tubemaster 6 1098 Last post November 04, 2011, 06:17:48 PM
by Kid Kulafu
PECE logo
Professional People
Latino_Heat 5 174 Last post March 23, 2011, 11:21:16 PM
by Latino_Heat
Pangit na Oath taking!!-May 17, 2011 PECE/ECE/ECT « 1 2 3 »
Professional People
suchaloser 47 930 Last post October 07, 2011, 09:56:08 AM
by Kid Kulafu
Powered by MySQL Powered by PHP Powered by SMF 1.1.15 | SMF © 2011, Simple Machines Valid XHTML 1.0! Valid CSS!