Red Icarus
CR2032 Battery
**

Pogi/Ganda Points: 0
Offline Offline

Posts: 26


« Reply #40 on: June 18, 2008, 10:53:29 AM »

Dude maraming thank you talaga.. this is useful to us..
Logged
The Philippine Electronics and Technology Forum
« Reply #40 on: June 18, 2008, 10:53:29 AM »

 Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #41 on: June 19, 2008, 12:48:14 PM »

yung last project ko eh hart din ang ginamit. 4-20ma. mga transmitter nila eh halos ganun lahat.

br

ah ganun b sir... ang pinaka-advantage lang naman ng fieldbus eh mas konti ang wires na gagamitin, 1 pair lang kaya ang 31 na instrumento kasama na yung link master/scheduler... ndi ktulad ng hart kada instrumento isang pair ng wire, imagine kung sa planta may 10,000 instruments ka... parang spagetti yung cable trench at tray nun heheh... kaya ngayon yung mga package na lang ang gumagamit ng conventional, pero papunta na din sila sa fieldbus, kaya mas ok kung may background na tayu... open ang qatar gas/petroleum ngayon maganda offer nila sa instrument technician 12k riyals family status pa... sayang naka kontrata na ako dito eh... heheh next time baka lipat ako, dami pa naman nila kelangan sa maintenance...  Grin
Logged
ahlburuto
Diesel Generator
*

Pogi/Ganda Points: 24
Offline Offline

Gender: Male
Posts: 1591


E&I tech.


« Reply #42 on: June 19, 2008, 01:09:18 PM »

ah ganun b sir... ang pinaka-advantage lang naman ng fieldbus eh mas konti ang wires na gagamitin, 1 pair lang kaya ang 31 na instrumento kasama na yung link master/scheduler... ndi ktulad ng hart kada instrumento isang pair ng wire, imagine kung sa planta may 10,000 instruments ka... parang spagetti yung cable trench at tray nun heheh... kaya ngayon yung mga package na lang ang gumagamit ng conventional, pero papunta na din sila sa fieldbus, kaya mas ok kung may background na tayu... open ang qatar gas/petroleum ngayon maganda offer nila sa instrument technician 12k riyals family status pa... sayang naka kontrata na ako dito eh... heheh next time baka lipat ako, dami pa naman nila kelangan sa maintenance...  Grin

oo tama ka. di ko na matandaan yung ginawa nila dun sa dating plant na napagtrabahuan ko para malinis yung mga tray. Ah ang design pala nila dun eh kung sa isang area eh me 30pcs na instrument eh maglagay sila ng isang Instrument JB at dun nila pagsamahin ang mga single pair na cable galing sa mga instrument. Tapos multi core na ang pupunta sa LER hanggang sa control. Nasa magkano sa US dollar yung 12k riyal? me apply din ako sa singapore ngayon at maganda rin bigay eh...

Nung nasa local ako eh ang tanda kong ginamit na communication dun eh profibus. me limit nga lang ang connection nun. pero sa fieldbus eh wala pa akong experience.

br
Logged

Walang GUYAM kung walang GUGUYAMEN...... Tongue
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #43 on: June 19, 2008, 02:02:11 PM »

oo sir ganun nga ang design nila ngayon, nga pala may bagong pauso sa instrumentation ngayon, baka kasi tanungin sa interview, dito ko lang din na-experience sa planta namin, yung ILD (Instrment Loop Diagram) sa loop folder biniyak-biyak nila nag-add sila ng bagong file tawag Two wire drawing, bale yung ILD ngayon 3 bahagi na 2 wire drawing, instrument package and segment diagram, dahil siguro sa fieldbus... mga nasa 3.3KUSD yung basic +OT and taxfree puede na din pagnakaipon uwi na lang sa pinas then magtayo na lang ng negosyo... heheh... pero balak ko din sana magturo sa instrumentation pag ayaw ko na d2 sa abroad para nman may kabuluhan yung mga experience ko sa field Grin
Logged
ahlburuto
Diesel Generator
*

Pogi/Ganda Points: 24
Offline Offline

Gender: Male
Posts: 1591


E&I tech.


« Reply #44 on: June 19, 2008, 02:17:40 PM »

oo sir ganun nga ang design nila ngayon, nga pala may bagong pauso sa instrumentation ngayon, baka kasi tanungin sa interview, dito ko lang din na-experience sa planta namin, yung ILD (Instrment Loop Diagram) sa loop folder biniyak-biyak nila nag-add sila ng bagong file tawag Two wire drawing, bale yung ILD ngayon 3 bahagi na 2 wire drawing, instrument package and segment diagram, dahil siguro sa fieldbus... mga nasa 3.3KUSD yung basic +OT and taxfree puede na din pagnakaipon uwi na lang sa pinas then magtayo na lang ng negosyo... heheh... pero balak ko din sana magturo sa instrumentation pag ayaw ko na d2 sa abroad para nman may kabuluhan yung mga experience ko sa field ;

D


aba malaki na rin yun.... parang ganyan na rin yung setup ng ILD namin sa Exxon mobil ah... me sample ka nung ganung ILD? para naman makita ko... not so sure ako dun sa exxon kung ganun nga. Nga pala WINpcs ang gamit nain dun sa commissioning...

br
Logged

Walang GUYAM kung walang GUGUYAMEN...... Tongue
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #45 on: June 19, 2008, 04:16:15 PM »

sige sir pag nakuha ko sa saturday yung softcopy nung file i-post ko din dito...  dito samin naka-excel and pdf format na lahat ng gamit namin sa commissioning medyo lowtech pa sila heheh... pero sa DCS and instrument maintenance ayus hightech na PRM na gamit namin Plant Resource Management sige sir post ko nalang yung mga files na puede nating pakinabangan heheh.... Grin
Logged
ahlburuto
Diesel Generator
*

Pogi/Ganda Points: 24
Offline Offline

Gender: Male
Posts: 1591


E&I tech.


« Reply #46 on: June 19, 2008, 04:47:48 PM »

Mas ok gamitin yung WINPCS na program... madaling maghanap ng mga data dun at connected din sya ata sa server. para pag nag update ka ng files eh updated na rin sa ibang PC.


OT

laking problema ko ngayon... yung passport ko eh nasa isang agency na at for processing na ng visa sa russia ulit. Ng bigla namang tumawag tong sa singapore... at maganda ang bigay. tinawagan ko yung amo ko sa russia at ang sabi nya sakin kung pupunta daw ako ng singapore eh di na ko makakabalik ulit dun... hay... almost 1year na rin kasi akong nasa local at on and off ang sideline ko dito... sana tama ang gagawin kong desisyon na igrab ang oppurtunity sa singapore. yung mrs ko eh parang ayaw pumayag sa desisyon ko eh...

 Sad Sad Sad
Logged

Walang GUYAM kung walang GUGUYAMEN...... Tongue
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #47 on: July 29, 2008, 10:20:47 PM »

mabuhay kayu mga sir... eto pala yung ibang softcopy ng mga training materials ko dito sa petrochemicals, triconex from invensys IPS gamit namin sa control ng turbina, ESD emergency shutdown devices, F&G fire and gas system etc... advantage kung aware tayu sa system mas malaki tyansa mapasok sa OIL&GAS or petrochem kasama nga pala sa interview yan, buti dati nabasa ko sa internet... heheh... download nyo na lang mga sir, sana makatulong kahit papano...

http://rapidshare.com/files/104071904/Part_1_Introduction-Principals_of_Tricon_Design.pps
http://rapidshare.com/files/127608833/Part_2_Tricon_System_components.pps
http://rapidshare.com/files/127611088/Part_3_for_8903___overview_of_tristation.pps
http://rapidshare.com/files/127613119/Part_4_Administrative_features.pps
http://rapidshare.com/files/127615811/Part_5_Develop_the_application.pps
http://rapidshare.com/files/127619402/Part_6_Configure_the_controller.pps
http://rapidshare.com/files/127621393/Part_7_Set_Up_TriStation_Communication.pps
http://rapidshare.com/files/127621510/Part_8_Implementation.pps
http://rapidshare.com/files/127621967/Part__9_Tristation_Diagnostic_Monitor.pps
http://rapidshare.com/files/127624385/Part_10_Maintenance_of_Tricon.pps
http://rapidshare.com/files/127624797/Part__11_Tristation_SOE.pps

next time yung tristation naman para makapag-program ng FBD logic at makapagsimulate kahit walang hardware may virtual hardware na din syang kasama... rgrds, rov1976
Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #48 on: July 29, 2008, 10:31:09 PM »

nga pala yung tristation ndi gumagana sa vista sorry vista users pero pag nakakuha ako ng update i-post ko uli para ma-download ninyo... Smiley
Logged
paranz
Technical People
Nuclear Reactor
*****

Pogi/Ganda Points: 167
Offline Offline

Gender: Male
Posts: 4511


1/4W resistor specialist


« Reply #49 on: July 29, 2008, 10:35:14 PM »

@rov

you've share a lot..thanx Wink
Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #50 on: July 29, 2008, 10:40:21 PM »

@rov

you've share a lot..thanx Wink

' just wanted to help sir... nag-umpisa din kasi ako sa wala and madami ding tao sa forum na tulad nito ang nakatulong sakin, binabalik ko lang Smiley rgrds, rov
Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #51 on: July 30, 2008, 01:13:48 AM »

eto na mga sir/ma'am, the most awaited moment... sensya na po ngayon lang kasi natapos yung upload ko sa rapidshare... full working software yan i've got it from the service engineer that conducted our training last month, share ko na din sa inyo so parang nag-attend na din kayu ng full course sa triconex and tristation ng invensys... here's the link http://rapidshare.com/files/133344528/Tristation_1131_V4.1.419.rar

rgrds, rov
Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #52 on: July 30, 2008, 01:53:50 AM »

hyew! ngayon lang din natapos yung upload ko thru rapidshare practical approach sa instrumentation mga training materials ko yan pinili ko na yung mga kailangan. download nyo na lang sa rapidshare using the free services, reset nyo na lang yung modem after magdownload para ma-download nyo uli yung ibang files na na-upload ko sa rapidshare... rgrds, rov

eto pala yung link:
http://rapidshare.com/files/133375701/rov_instru.rar
Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #53 on: July 30, 2008, 09:18:09 AM »

guys paki-test na lang yung link kung gumagana sa inyo, post nyo na lang kung may error... rgrds, rov
Logged
boy kalikot
LR44 Battery
*

Pogi/Ganda Points: 0
Offline Offline

Posts: 5



« Reply #54 on: August 04, 2008, 08:55:09 PM »

guys paki-test na lang yung link kung gumagana sa inyo, post nyo na lang kung may error... rgrds, rov

Bro ok mga post mo, nagself study rin ako ngayun sa instrumentation and control, may mga training na ako sa  meralco foundation Basic saka advance PLC,
kaya medyo nakkarelate me dito, actualy nakkadesign na ng basic basic control.Bro ano bang maaadvice mo kasi balak kung pumasok sa intrumentation and control na career. Dito me ngayun sa Bahrain nagwowork, kaso yung work ko dito di gaano ka high tech yung mga project ko dito,kaya naghhanpa ako kung makakapasok me sa oil and gas career.

tnx bro
Logged
rov1976
CR2032 Battery
**

Pogi/Ganda Points: 4
Offline Offline

Gender: Male
Posts: 46



WWW
« Reply #55 on: August 05, 2008, 04:26:34 PM »

Bro ok mga post mo, nagself study rin ako ngayun sa instrumentation and control, may mga training na ako sa  meralco foundation Basic saka advance PLC,
kaya medyo nakkarelate me dito, actualy nakkadesign na ng basic basic control.Bro ano bang maaadvice mo kasi balak kung pumasok sa intrumentation and control na career. Dito me ngayun sa Bahrain nagwowork, kaso yung work ko dito di gaano ka high tech yung mga project ko dito,kaya naghhanpa ako kung makakapasok me sa oil and gas career.

tnx bro

sir, kung medyo kampante ka na sa instrumentation at aware ka sa latest technology at instrument na ginagamit... puwedeng-puwede ka na sumabak, pero payo ko lang huwag ka magmadali lalo na pag na-interview ka na ng employer, kasi karamihan sa middle east mga subcontractor lang mas maganda kung mapapasok ka sa main contractor or direct gaya ng aramco, rasgas, sabic etc... kung sa mga main contractor naman ok ang technip france/italy, JGC, philips chevron... at kung gusto mong siguradong agency magpasa ka na ng resume mo sa IPAMS sa may pedro gil ang main office nila, yun ang nagpaalis sakin para mapasok sa SABIC, oks dun walang placement at gastos, basta ma-lineup ka nila sa interview then nasagot mo naman mga tanong ng employer ayus na malaki tiyansa mo ma-hire, then yung health natin syempre dapat alaga din kasi medyo mahigpit sa medical dapat prepare din tayu dun... goodluck sir sa pag-aapply hopefully mapunta ka din at maging successful sa intrumentation and controls... Smiley
Logged
BoyAlgoa
CR2032 Battery
**

Pogi/Ganda Points: 1
Offline Offline

Gender: Male
Posts: 22



« Reply #56 on: September 01, 2008, 01:13:10 PM »

Sir Rov,

I am working po sa isang sub contractor ng Chevron dito sa Angola, my main function is electrical maintenance, planning and designs na rin. I have experience doing one project which includes monitoring of Power using Yokogawa Energy Meter, I used Specview32 as my SCADA Systems connected through Ethernet-MODBUS. After that small project, nag spark na ung hilig ko sa instrumentations and Controls. I also have a good background with Siemens S7 since most of our CNC machines here uses Siemens.

Gusto ko lang po i-thank you ikaw for sharing your experience and inspire other engineers here as well. As much as I would like to indulge more on Instrumentations and Controls, kaso po baka wala namang tumanggap sa akin since medyo iba rin ang job experience ko. Most of the time kasi ay board level naman ako dito, medyo dun naman ako nagsasawa ngayon. Gusto ko naman ay designing ng Instrumentation Controls and designing ng SCADA systems. Haaay sana makakuha ako ng company na katulad ng sa inyo hehe...
Logged
rodcabzmd
CR2032 Battery
**

Pogi/Ganda Points: 0
Offline Offline

Posts: 8


« Reply #57 on: October 05, 2008, 04:39:31 PM »

Although parang napaka-late na ng reaction ko sa topic dito, eh nagpapasalamat ako sa tulad ni Sir Rov, sana dumami pa ang katulad niyong gustong magshare ng mga valuable resources para sa mga aspiring na malinya sa Instrumentation and Control (isa na ako dun..)

Ako nga po pala ay ECE na nasabak sa Test Engineering sa isang semicon...
Logged
ferdie444
Size C Battery
*****

Pogi/Ganda Points: 4
Offline Offline

Posts: 194


« Reply #58 on: October 06, 2008, 01:52:27 AM »

@ rov1976 and ahLbUruTo,ok pala madami din pala tayo dito sa forum na nasa instrumentation field.i'm working as instrument tech here in abudhabi(zakum development company) for offshore/onshore oilfield facilities.bale nasa maintenance dept. and responsible for the maintenance,troubleshooting and repair of fire & gas system,turbine control system,process control system,wellhead control system including telemetry & scada system,telephone,radio and paging system and sometimes lan.ok talaga itong instrumentation dahil kelangan mong i-apply ung knowledge mo sa electronics,electrical,mechanical and hardware/software bale challenging talaga ito.work cycle namin dito eh 42 days on(work),21 off(leave),in otherwords medyo malimit ako umuwi ng pinas.by the way,i'm 3years electronics technology graduate and a certified technician-lic.(process engineering maint. inst.& control level 2)by scottish qualification authority.thanks and more power.......
Logged
maldihtah13
Technical People
Nuclear Reactor
*****

Pogi/Ganda Points: 110
Offline Offline

Gender: Female
Posts: 4448


Everyday is a learning process so try to learn ;D


« Reply #59 on: October 06, 2008, 09:31:31 AM »

@ rov1976 and ahLbUruTo,ok pala madami din pala tayo dito sa forum na nasa instrumentation field.i'm working as instrument tech here in abudhabi(zakum development company) for offshore/onshore oilfield facilities.bale nasa maintenance dept. and responsible for the maintenance,troubleshooting and repair of fire & gas system,turbine control system,process control system,wellhead control system including telemetry & scada system,telephone,radio and paging system and sometimes lan.ok talaga itong instrumentation dahil kelangan mong i-apply ung knowledge mo sa electronics,electrical,mechanical and hardware/software bale challenging talaga ito.work cycle namin dito eh 42 days on(work),21 off(leave),in otherwords medyo malimit ako umuwi ng pinas.by the way,i'm 3years electronics technology graduate and a certified technician-lic.(process engineering maint. inst.& control level 2)by scottish qualification authority.thanks and more power.......

uy sir ok dyan ah. Wla ba tayo hiring dyan he he he. Four years na ako sa hydropower plant working right now as a maintenace engineer. Mostly hawak ko eh PLC at kung anu anu rin.
Logged
The Philippine Electronics and Technology Forum
   

 Logged
Pages: 1 2 [3] 4   Go Up
  Print  
 
Jump to:  


Related Topics
Subject Started by Replies Views Last post
project po 2ngkol sa home automation « 1 2 3 »
Microcontroller/Microprocessor Unit Projects and Programming
icaboo 41 4235 Last post March 02, 2010, 12:45:00 PM
by travian19
Home Automation: about relays help po
Electrical Circuits and Devices
mumu 11 880 Last post January 23, 2012, 12:36:40 PM
by rage3657
automation and biometrics
ECE Students
ece_reb 0 371 Last post November 14, 2009, 06:39:50 PM
by ece_reb
SMS home automation
Introduce Yourself
path32 4 690 Last post February 20, 2010, 11:10:37 AM
by path32
WANTED: Senior Control Systems Engineers
Job Vacancies
jefisipbata 2 367 Last post May 17, 2010, 07:38:30 AM
by jefisipbata
RSA Automation & Robotics
Academic Seminars and Field Trips
sistematic 4 529 Last post November 06, 2010, 12:01:18 PM
by akhen
pahelp nmn po s school automation ko
Thesis and Project Proposal
kira_ash20 1 68 Last post July 28, 2011, 10:03:56 PM
by circuit_zero
Powered by MySQL Powered by PHP Powered by SMF 1.1.15 | SMF © 2011, Simple Machines Valid XHTML 1.0! Valid CSS!